5th Avenue at Delray

Mouw Associates, Inc. was contracted to construct the shell only. This project was very ambitious. There is an entire parking level below grade and into the water table. The entire site had to be sheet piled, dewatered 24/7 (6 months), and special night pours starting at 12:00 am.

Palm Beach Polo Townhomes

Palm Beach Polo Condominiums and Golf Cottages were constructed as part of a master planned project.

First Presbyterian Church of Delray Beach

after construction photo of front of church

Project consisted of an interior renovation, main entrance addition, bathroom addition, and extension of the sanctuary. The entire campus was repainted as well as a majority of the roofs were repainted. All new drainage was installed and grades reworked along with new asphalt. striping, and landscaping to update the grounds and provide for a more […]

The Falls Mall

This Mall was originally built under a joint venture with Mouw/Pepper.  Complete renovation and addition.

Office Depot Headquarters

Office Depot relocated their corporate headquarters to the former IBM Campus in Delray Beach, Florida in the early 1990’s. The existing campus consisted of three, four story buildings, totaling 480,000 square feet, which required total renovations and buildout. Over the eight years of service, Mouw Associates, Inc. continued to provide all construction services to meet the […]