Construction Management (CM) at Risk

Construction Management at Risk is a process that allows the owner or client to hire a CM before the design is complete. Through this business relationship Mouw Associates, Inc. can assist the owner and architect in all aspects of the project from the inception of the design. This helps to ensure the owner avoids any unnecessary costs, maintains schedule, and creates project collaboration through the team approach. This approach centralizes the responsibility of the construction under a single contract to deliver the project at or under a Guaranteed Maximum Price.

This process incorporates the preconstruction service as well as taking the project through the construction phase and final closeout. One of the many benefits of this relationship is the transparency amongst parties. All costs and fees are an open book policy and the final project costs and accounting is provided at the end of the project. The CM at risk helps keep projects within their target budget and creates a strong collaboration amongst owner, architect, construction manager, and subcontractors.

  • Best value to owner
  • Transparency is enhanced
  • Preliminary Budgets are achieved

Featured Projects

  • Bethesda West HospitalProject consisted of converting 58 acres of agricultural land to a commercial mixed use property which included new offsite water mains/force mains, lift station, parking lots, roadways, state road turn-lanes, median...

  • Delray Dunes Country ClubProject consisted of demolishing the existing clubhouse and pool facilities. Constructed a new 27,800 square foot main Clubhouse, with a 3,700 square foot Fitness Building with pool and patio. Sitework consisted...

  • Private ResidenceNew Residence.

  • Northern Trust

  • Comprehensive Cardiovascular CenterProject consisted of a four story addition and build out of existing shelled space which included adding 31 Private Patient rooms, 8 CVICU Private rooms, 10 Prep/Recovery rooms, 2 Operating rooms,...

  • Office Depot HeadquartersOffice Depot relocated their corporate headquarters to the former IBM Campus in Delray Beach, Florida in the early 1990’s. The existing campus consisted of three, four story buildings, totaling 480,000 square...

  • Gulfstream Business BankThis project was the second bank built by Gulfstream Business Bank. What was seen as a small parcel of land turned into a beautiful two-story office building with the bank occupying...

  • 5th Avenue at DelrayMouw Associates, Inc. was contracted to construct the shell only. This project was very ambitious. There is an entire parking level below grade and into the water table. The entire site...

  • Boca West Country Club

  • Central Utility Plant ExpansionProject consisted of an expansion to their Central Utility Plant which included (2) 500HP Boilers, (1) 1,500 ton Chiller, (1) Cooling tower, (1) 1,000 gallon Daerator, Chilled water and Condenser water...